Project:
Sempach-Neuenkirch – Sursee (SBB CFF FFS)

Supplementary information
to formation rehabilitation
and bed recycling

Sempach – Nottwil: km 78.765 – 75.282 and km 74.832 – 74.006
3.775m PLV and 534m bed recycling
Nottwil – Oberkirch: km 73.372 – 71.520
480m PLV and 1.372m bed recycling
Oberkirch – Sursee: km 71.070 – 70.390
680m bed recycling

Builder-owner:
Schweizerische Bundesbahnen SBB , Infrastructure

Construction period: 27.07.2019 – 04.08.2019

Overall conversion length: 6.853 m
Type of permanent way: W60-1667-B91

Supplementary information further to track permanent way:
Minimum radius = 1.192 m
Superelevation: u = 120 mm

The complete data are available for downloading as a PDF.